A1 Alleredene Bridge Gateshead

A1 Alleredene Bridge Gateshead

Corrosion of embedded steel had taken place within the bridge deck, Diamondcrete RD facilitated early completion of the works with reduced manpower and plant ensuring less disruption

Read more
  • Ascot Racecourse

    Ascot Racecourse

    London Concrete supplied the new Ascot Grandstand, at the famous racecourse following a complete rebuild.

    Read more
  • Burnley WWTW

    Burnley WWTW

    Chemical dosing plant uses Diamondcrete AE as a cost effective solution whilst maintaining the required level of chemical resistance to the exposed concrete surface

    Read more
  • Clyde Arc bridge

    Clyde Arc bridge

    New bridge built over the river Clyde, construction entailed casting concrete within and over the river.

    Read more
  • DHL Hams Hall distribution facility

    DHL Hams Hall distribution facility

    Cracking to external paving at DHL’s Hams Hall distribution facility, Diamondcrete RA, a fast curing high strength concrete used to meet operational deadlines for return to use

    Read more
  • Glasgow Harbour Development

    Glasgow Harbour Development

    14 storey apartment development, Cemflow H, a free flowing concrete used to eliminate the need for vibration equipment and allowing immediate finishing of flatwork.

    Read more
  • Mavis Valley waste recycling centre

    Mavis Valley waste recycling centre

    The aggressive environment required a concrete that would resist both abrasive and dynamic forces

    Read more
  • Recycling centre, Carlilse

    Recycling centre, Carlilse

    Supplied a macro structural plastic fibre concrete of S3 consistency

    Read more
  • River Eden water intake facility

    River Eden water intake facility

    The framework contractors had a requirement to install concrete into water whilst minimising washout of the cementitious fraction

    Read more
  • St Margarets Primary School, Dundee

    St Margarets Primary School, Dundee

    Construction of a new primary school incorporating a wet under-floor heating system to receive a screed prior to installation of decorative finishes

    Read more