Aggregate Industries logo

Highbury Apartments, London

« Back to your search results

Highbury Apartments, London

  • Print
Precast concrete supplied to Highbury Apartments development, London
1 of 5 | Precast concrete supplied to Highbury Apartments development, London
Highbury Apartments, London
2 of 5 | Highbury Apartments, London
Highbury Apartments, London
3 of 5 | Highbury Apartments, London
Highbury Apartments, London
4 of 5 | Highbury Apartments, London
Highbury Apartments, London
5 of 5 | Highbury Apartments, London

Precast concrete products supplied to a high standard and delivering them completed to reduce on-site construction time.

Key facts

Sector: Housing
Client: Sir Robert Mcalpine
Contractor: Byrne Brothers
  • Great supply chain
  • Innovative solutions
  • Best value

Brief

To create new apartments constructed within the old Arsenal Football Ground. The apartment price range £350-£600K with penthouses at £1.2M. The existing listed building façade needed to be supported by £3M of site steelwork during construction 

Solution

Project was originally envisaged as an insitu concrete option but manufacturing in precast saved customer 2 months on site.

Precast continuity columns were manufactured with projecting reinforcement and coupler bars specifically designed to take different floor loads at each level.

The lengthy design period and extensive changes meant that production had to remain flexible throughout.

Supplied 2,410 columns and beams with 444 different unit supplied. Total weight supplied was 3,075 tonnes in 300 deliveries.

Each individual column referenced to a specific location on site making unit identification and call off critical to the project.

Highbury Apartments, London

  • Print

What are you looking for?

Where to find us?

Please enter your town, city or postcode and the fields that you want to search on (if relevant):

International enquiries >

The
Responsible
SourceTM

Read more >