Seathwaite Tarn Dam

« Back to your search results

Seathwaite Tarn Dam

  • Print
Ready-mix concrete delivered to site of Seathwaite Tarn Dam
1 of 5 | Ready-mix concrete delivered to site of Seathwaite Tarn Dam
Small truck still manages to meet specification requirements.
2 of 5 | Small truck still manages to meet specification requirements.
Delivering the product despite difficult route
3 of 5 | Delivering the product despite difficult route
Remote location still reachable by our vehicles
4 of 5 | Remote location still reachable by our vehicles
Working in unison wirh external contractors.
5 of 5 | Working in unison wirh external contractors.

We supplied a bespoke ready-mix concrete product under a difficult supply route and individual specifications to meet the customer's requirements.

Key facts

Sector: Utilitise
Client: Eric Wright Construction Ltd
Contractor: Eric Wright Construction Ltd
  • Solution Provider
  • Good supply chain
  • Easy accessibility to technical support and customer service

Brief

Eric Wright Construction Ltd turned to us for a solution to a very technical and tricky logistical problem.

The Tarn Dam was constructed some 100 years ago on the remote summit of Seathwaite Fell. The water in the area is collected having passed through the top peat soil layer, and has been eating away at the limestone.
 
A solution to stave off the erosion was discovered using blue local granite which is resilient to acid attack.

Solution

Could we source the necessary blue granite and produce a concrete that could travel the difficult road journey of 35 miles across Cumbrian fell B roads, plus the 3 miles up the old cart track and across the drain reservoir temporary road to the dam repair site? Would our smaller truck be able to cope with all this, and arrive with the concrete still in specification? The answer...yes!
 
With the granite sourced from our Ghyll Scaur Quarry and the technical department trialling the mixes to accommodate the long journey time the mix designs where passed by the structural engineers.
 
In all we did seven pours covering a three-month period finishing early December 2008. The weather throughout that period was very inclement and on many occasions the pours where cancelled because of severe frost and ice on the old cart road.
 
This is a true example of an established relationship, we worked very closely with the contractors in a difficult set of circumstances that needed a professional solution.

Seathwaite Tarn Dam

  • Print

What are you looking for?

Where to find us?

Please enter your town, city or postcode and the fields that you want to search on (if relevant):

International enquiries >

The
Responsible
SourceTM

Read more >