Using Supercurve with Sefton council to ensure effective and fast traffic management

Having worked closely with Dowhigh Ltd and Sefton Council over the last few years, Aggregate Industries were once again asked to help with the traffic management and associated vehicular issues for this contract

The background

Having worked closely with Dowhigh Ltd and Sefton Council over the last few years, Aggregate Industries were once again asked to help with the traffic management and associated vehicular issues for this contract. The area in question was the Princess Way Roundabout/Crosby Road South highway at the Seaforth end of the docks, and the carriageway from the port exit to the roundabout under the A565 flyover.

 

The problem

The high volume of HGVs accessing and exiting the port every day took its toll on the existing carriageway’s HRA surface, causing deteriorating longitudinal joints. Sefton Council identified that two running lanes into the Port Entrance and a newly constructed third lane to accommodate traffic to Crosby would be the best solution. With it being a main, busy route, they faced time restraints from Sefton Council, Highways England and Liverpool Port for the resurfacing.

 

The solution

Recognising that the carriageway’s existing HRA surface had deteriorated, Dowhigh looked for alternatives. Following the success of Aggregate Industries’ SuperFlex® product within the Highway Resurfacing division of Sefton, they decided that the new ‘SuperCurve®’ product would be the best choice. Durable and long-lasting, it would be able to withstand the large volumes of HGVs passing through day after day.

For the work to take place, road closures and traffic diversions would need to be put in place, which was agreed upon by Highways England, Sefton MBC, Port of Liverpool and Merseyside Police. From there, Phase 1 was completed between 10am and 3pm in November 2017, and Phase 2 between 8pm and 2am in March 2018, causing minimal disruptions.

Opting for SuperCurve®, it was laid by two pavers working in Echelon, which minimised the longitudinal and cross joints where HGVs would travel into the port.

Get in Touch

Find out how we can help support your next project.

Project details

  • Infrastructure

  • Sefton Council

  • Dowhigh Ltd

    • Carbon footprint significantly reduced throughout project
    • Only 7 mile round trip to deliver 1,022T of SuperCurve
    • Durable and long-lasting