Product information
- Highflow rapide technical data sheet (pdf, 432.21 KB)
- Concrete sector guide (pdf, 4.66 MB)
- Concrete ready-mix screed portfolio brochure (pdf, 3.07 MB)
Allows reduced programme time
No spray-on curing membranes reducing airborne contamination and eliminating associated safety issues.
No reinforcement or fibres required and fewer joints with much larger bay sizes.
Allows early foot traffic.
Can be loaded after just 7 days.
Enables greater efficiency of underfloor heating systems.
Allows early floor covering application, e.g. in as little as half the time when compared to other standard anhydrite screeds.
01530 610098